Specifications

Control Interface Module, Continued
Step Procedure
Note: Cable Routing: When replacing the cables on the CIM-Base
in the following step, take note of the routing. The display
backlight cable runs behind the board standoff as shown on
the left image below. In addition, the display control interface
cable is routed behind the board as shown in the right image
below.
8. Install the new CIM-Base back onto the door by repeating
the previous steps in reverse order, including reinstallation of
flat washers and nuts and then reconnection of all cables to
the CIM.
9. Apply power to the Maxum and allow it to boot.
10. If necessary, restore the analyzer database using the .amd
file that was saved before beginning this procedure.
11. If the CAC3 is unplugged, current date and time information
is lost. If the analyzer is configured to obtain date and time
information from a central server, then it will update
automatically. If no time server is set, it will be necessary to
manually set the date and time on the analyzer.
A5E31405710001 4-9