Operator`s manual

Thread the left Section 3 Extension Cable as indicated in Figure 4-13 and fasten one end of the
cable to the left cable attaching bracket on Section 1. Thread the locking nuts on the ferrule, only
until the end of the ferrule is flush with the end of the second nut. Extend the Second Section of the
ladder, using the ladder hydraulics, until the rungs of the Section 2 exactly coincide with the rungs
of Section 1. Pull the Section 3 Extension Cable tight and thread the ferrule through the cable
attaching bracket on Section 3 of the ladder. Adjust the locking nuts on each end of the cable until
the rungs of Section 3 exactly coincide with the rungs of Sections 2 and 1.
8.8.2 Replacing the Retracting Cable
With the ladder hydraulics, extend the ladder to full extension. Thread the Retraction Cable as
described in para. 4.2.3 (see Figure 4-14). Attach the threaded ferrule to Section 3 Compensator
with the end of the ferrule flush with the second locking nut. Pry the Compensator with a pry bar
until half of the available adjustment is taken up and block in this position.
Employ two persons to pull the cable as tight as possible towards the Extension Hoist drums while a
third person puts two wraps of cable, clockwise, on the right-hand drum and fastens tne curved
ferrule to the flange of the drum with attaching bolts.
Release the tension on the Compensator and then tighten the locking nuts on the ends of the
threaded ferrules until half of the Compensator adjustment is again taken up. If there is not
sufficient adjustment available on the ferrules to tighten the Compensator, block it once again, pull
the cable tighter and advance the curved flange on the drum.
56