The Basics 2-16
The Date Headings
Display up to four date heading levels with formats ranging from minutes to years to custom entries.
1. To change the date heading display, click once on the date heading within the schedule. This will display
the Selection menu. Optionally, choose Dates | Date Headings | Date Headings Full Dialog
2. For each level, choose from more than 35 Heading Types (yearly, monthly, etc.).
3. Align each heading’s text.
4. Choose a Start number for the heading.
This feature is useful to start a schedule on a specifi c number that does not relate directly to the dates
on the schedule. For example, if your schedule starts in January, you can use a start number of 5 to
show that January is the 5th month since the start of the contract.
5. Choose a Frequency for the heading.
For example, in a yearly heading of a project whose start date is 1/1/2008, with a frequency of 2, the
yearly heading would be 2008, 2010, 2012, etc.
6. Choose to display the date headings at the top and/or bottom of the schedule.
See Chapter 6 for more information on date headings, including custom headings.
Add Graphics to the Schedule
You can paste graphics anywhere on your schedule.
1. Copy the image (e.g. by right-clicking on an image and choosing “copy”).
2. In Milestones, choose Edit | Paste | Picture.
3. The Paste Picture cursor appears: .
4. Move the cursor to the appropriate location, and then click to paste the image.
-or-
1. Choose Insert | Picture, Legend | Picture from fi le.
2. Browse to the graphics fi le, select it, and choose Open.
3. The Paste Picture cursor appears: .
4. Move the cursor to the appropriate location, and then click to paste the image.
To resize the graphic, click once on it, hold down the Shift key, click-and-hold on a corner of the graphic, and drag