Dependencies 5-4
With
Always move dependent symbols based upon duration, moving the
start date forward by one day would result in the end date moving ahead one
day, to the next day regardless of working/non-working days, as shown to the
right. The duration would change to four days if weekends are non-working
days.
Add and Edit a Vertical Link
There are three methods for adding vertical links between symbols on different task rows: (1) Add a vertical link
between two symbols using the mouse; (2) add a vertical link between two symbols using the Selection menu; (3)
add vertical links between symbols on selected task rows using the Insert menu.
Follow the directions in the schedule below to add a vertical link with the mouse:
If this exact order is used, then the chosen vertical link will
appear between the two symbols, as shown to the right:
If you continue to add links after these four steps, then you can skip step 1 and begin the next link procedure with
step 2. If other actions are performed (e.g. moving a symbol), then you should begin with step 1 when adding
another vertical link.
If your vertical links are not displayed, make sure the option to display task links is checked. Refer to page 5-2 for
more information.
!
"
#$
$
%&#'$$ ! $$&
&#'$$ $&
(&#'$$) '&
*&#'$$ $&