User manual
Dependencies 5-6
This is the result of a Finish-to-Start choice:
Edit an existing vertical link
Chapter 3 discusses how to change the default settings for vertical links. Here is how to change a single
vertical link that is already on the schedule, from one type to another.
1. In the toolbox, click the tool.
2. On the schedule, click once on the symbol from which the link extends.
3. In the toolbox, click once on the new vertical link. The new vertical link appears.
Remove Vertical Links
Vertical links can be removed from their originating symbols by selecting either a single symbol, a task
row containing multiple parent symbols, or multiple task rows containing vertical links.
Remove a single vertical link
1. In the toolbox, click the tool.
2. On the schedule, right-click the parent symbol from which the link extends.
3. Choose Clear Vertical Links.
Remove vertical links from all symbols on a single task row
1. Right-click the task row (in the column area) that contains parent symbols whose vertical
links you wish to remove.
2. Choose Clear Vertical Links.