Specifications
Synergy Nano Technical Manual, Revision -
Page 261
17.0 INSTALLATION AND WIRING DIAGRAMS
The Synergy Nano is designed for both new equipment and retrofit applications. This section provides an
overview of the controller installation process. The Synergy Nano installation consists of the six steps
summarized here:
1. Configuration selection; Select the appropriate configuration for your test chamber, i.e.
Temperature/Humidity, Temperature/Pressure, etc.
2. Mount the controller and the other components.
3. Wire the controller, output boards, etc.
4. Setup the controller.
5. Test all alarm systems.
6. Verify control system performance for transient and steady state testing.
Note that some of these steps are simplified for some retrofits when those systems already have the output
boards installed. These steps are noted as such.
Detailed chamber specific retrofit installation instructions are available for some chambers at
www.tidaleng.com
.
Dangerous voltages are present in this equipment. Disconnect electrical service of source
and tag circuit out before servicing or replacing components.
17.1 Chamber Configuration Selection
To begin the installation process, select the configuration appropriate for your test chamber, i.e.
Temperature/Humidity, Temperature/Pressure, etc. See Section 6.10 for a list of standard configurations for
the Synergy Nano and Section 6.11 for a list of standard configurations for the Synergy Nano Plus. Consult
the factory for custom configurations.
Details of wiring for the Synergy Nano are covered in Section 17.3 and for the Synergy Nano Plus in Section
17.4.