AccESS Installation Manual
Table Of Contents
REV020620
SimpliPhi Power, Inc. | 3100 Camino Del Sol | Oxnard, CA 93030, USA | (805) 640-6700 | info@simpliphipower.com| SimpliPhiPower.com
| 19 |
4.0 – Installation & Wiring
This section covers how to install the PHI 3.8 Batteries within the AccESS unit, torque values,
communications and network preparation and how to wire the AccESS unit. It also provides guidance on
how to install optional AccESS unit components/accessories.
4.1 – Basic System Configuration Concepts
Safe and reliable installation requires trained and certified technicians. The following discussion is a basic
primer. Due to the variety of systems and components in the field, all possible scenarios are not covered. This
is not the purpose of this section of the manual. Refer to professional installers regarding your system and its
components and specifications. We encourage you or your installer to contact us with any specific questions
for technical support. We are committed to working with you and your installation team to achieve a safe,
reliable storage system that will provide years of maintenance free service.
4.2 – PHI 3.8 Battery Installation within the AccESS
After mounting the AccESS unit on concrete, place either 3 or 4 PHI 3.8 Batteries in the bottom of the
cabinet. Connect the Polar Cable that is pre-wired into the Mini PDP to the positive and negative terminals
of each PHI 3.8 Battery per the torque values outlined in the PHI Battery Installation Manual. Leave the
PHI 3.8 Batteries in the “OFF” position until the basic functional test.
CAUTION: Adhere to all battery installation instructions as outlined in the PHI Battery
Installation Manual; this manual does not substitute the PHI Battery Installation Manual.
CAUTION: PHI 3.8 Batteries must be fully charged before commissioning the AccESS unit.
Failure to do so will Void the Warranty.
4.4 – Communications and Network Preparation
Communication and Monitoring is available via the Optional Schneider Electric Conext Gateway (XW Pro)
or ComBox (XW+) and the internet services available at the installation site.
A cellular Modem can be used to add range for far remote data monitoring.
Gateway or ComBox Configuration will enable:
• Viewing of all Xanbus Connected Devices: AGS, SCP, XW, MPPT
• Receipt of Email Energy Reports
• Receipt of Email Device Alerts
• Remote Monitoring, Control and Configuration via Modbus
• View Status and Updates via Android Tablet Interface
For Gateway or ComBox configuration, please see the provided documentation or download the latest
updates from Schneider Electric’s website.
Gateway downloads are available here: https://solar.schneider-electric.com/product/conext-gateway/
.
ComBox downloads are available here: https://solar.schneider-electric.com/product/conext-combox/.