Operation Manual

66 |
Installation checklist | AP70/AP80 Installation manual
Installation checklist
General
When all units are installed, external equipment connected and the software configured
according to the previous sections, the installation should be verified according to the check
lists in the following pages.
Checklist
Description Refer Yes/No N/A
Units mounted and secured according to instructions page 21
CAN bus powered and terminated according to instructions page 23
Correct power and polarity to computer and control units page 24
Sources selected page 42
SimNet groups defined page 44
Master station defined page 45
Drive units configured and calibrated page 46
Vessel configured page 52
Compass calibrated page 54
Seatrial completed (Autotune) page 56
Seatrial completed (Manual tuning) page 56
Connected equipment approved according to notified body
User training provided
Date:
Signature Installer Signature Captain
6