Operation Manual

On-board maintenance
151
850-164385 / Rev.C
Preventive maintenance schedule
Observe the following schedule for preventive maintenance on
the SH80 sonar system. Use this information to create a
preventive maintenance log, and make sure that every
maintenance action is logged accurately.
Note: It is very important that the preventive maintenance is carried
out correctly as at the specified intervals. All guarantee is
voided unless this schedule is followed.
Every three months
1. Inspect the dust filters on the Sonar Processor Unit. Clean
the filters, or replace if required.
2. Inspect the dust filters on the Transceiver Unit. Clean the
filters, or replace if required.
3. Carry out all the necessary lubrication of the hull unit.
Every time the ship is in dock
1. Perform a close visual inspection of the sonar trunk and
the transducer.
2. If required, clean the trunk and the transducer surface for
marine growth.
3. If the hull unit has been dismounted for service or repairs,
replace all zinc anodes.
Related topics
Wheelhouse units, page 152
Transceiver unit, page 154
Cleaning the transducer, page 160
Lubrication, page 163