Installation Guide

Step 3: Installing Fence Brackets
If posts are to be installed in level ground attaching brackets in advance 
of post installation is easiest when using a measuring template for 
faster repetitive bracket installation. It is easier to change a bracket in 
the eld if necessary than to install brackets once posts are installed in 
the ground. 
Installed brackets provide a leveling point on each post. 
DISTANCE FROM TOP OF POST TO SUPPORT BRACKET SURFACE  
Tip 
Note: Brackets come packaged at the tip of the 
post during shipping. They must be removed and 
reattached in the channel of the post at the desired 
height during installation. 
Step 4: Post Spacing & Concrete Footings
3’ High EcoStone Panel
Tools Needed
- Dig a hole 10”-to-12” in diameter
- Holes should be 24” deep for 3ft and 4ft 
panels and 36” deep fot 6ft panel. However, 
please consult your local building codes
- Use one and a half or two 80 lbs ready mix 
bags of concrete
- For a 3’ installation, the bottom 
of the post should be cut leaving 
a 56”-62” post (38” above ground 
and 24” below ground) 
- Cut the bottom of the post. 
NEVER cut the top of the post
Tip 
10”-12”
Hole Diameter
Panel Size 3’ 4’ 6’ 8’
Bracket 
Location
37.5” 49.5” 73.5” 98”










