Installation Guide

6’ High EcoStone Panel
4’ High EcoStone Panel
- For a 4’ installation,
the bottom of the post
should be cut leaving,
a 69”-74” post (50”
above ground and 24”
below ground)
- - Cut the bottom of
the post. NEVER cut
the top of the post
- For a 6’ installation, use our
102” posts which is designed to
be 28”-to-30” in the ground and
72”-74” above ground.
- Cut the bottom of the post.
NEVER cut the top of the post
Post Centers
71.50”
102”
74”
10”-12”
Hole Diameter
28”
70.25”
Stiffener Length
1.5” x 1.5” Gauge Galvanized Steel Stiffener
ASTM A513