Install Instructions
ASTM F1807 or F2159 with ASTM F877 V-Sleeve Installations & Application Problems
See F1807 for installation
See F2159 for installation.
F877: American Society for Testing and Materials
(ASTM) Standard Specication for Cross-linked
Polyethylene (PEX) Hot- and Cold-Water Distribution
Systems (PE-RT) Tubing.
V-Sleeve Installation
3. Install either an F1807 tting or an
F2159 tting fully into tube. Witness a
fully inserted tube through the slots of
the V-Sleeve top.
5. Compress tool perpendicular to
tubing run. Compress only once.
Remove defective connections. Use
a gauge to assure a proper joint. Test
completed joint.
Note: V-Sleeve tool teeth assure a
360º compression of stainless sleeve.
1. Cut tube at 90-degrees. Do not
crush OD of tubing with cutters.
Hint: Slightly rotate cutter during
blade engagement.
2. Install V-Sleeve Stainless Steel
Compression Sleeve onto OD of tubing
OR onto the tting. Load notched side
rst onto tting.
4. Assure sleeve is fully installed
onto square cut tube and assembly is
installed fully over a tting.
ASTM F877 Sioux Chief V-Sleeve Stainless Steel Press
Sleeve for PowerPEX (SDR9) Tubing
Sioux Chief has patented a stainless steel sleeve for
F1807 and/or F2159 ttings.
V-Sleeve is a compression sleeve that incorporates
notches at the top to evidence proper placement of
the tube against the tube stop on a tting, ensuring a
perfect installation.
Connection is made by compressing the sleeve to
create a full 360-degree seal over all the sealing
barbs. Sleeves can be pre-loaded onto the tube or
tting before installation and can remain in place for
ease of installation.
ASTM F1807 or F2159
with ASTM F877 V-Sleeve
™
17 www.siouxchief.com