Operating Instructions

Table Of Contents
5 Installation and startup
5.3 Installation site
Dentsply Sirona
Operating Instructions CEREC Primemill
18
67 19 681 D3439
D3439.201.01.01.0209.2019
5.3
Installation site
1500mm
59”
1500mm
59”
1500mm
59”
1500mm
59”
1500mm
59”
1500mm
59”
1500mm
59”
1500mm
59”
1500mm
59”
1500mm
59”
1500mm
59”
CAUTION
Install out of the reach of patients!
Do not install or operate the production unit in the vicinity of the
patient (place it at least 1.5m away from the patient).
The production unit requires a level base of approx. 729mm x 465mm
(W x D). The height of the production unit is:
with the processing chamber door closed: 454mm
with the processing chamber door, open: 675 mm
Install the production unit so that the main switch is easily accessible.
Make sure that the ventilation slots underneath and at the back of the
unit remain unobstructed. The distance between the back of the unit
and the wall must at least be 10 cm.
Note the weight of 46kg!
The unit must not be installed at sites with a high level of humidity or
dust!