Operating Instructions
Table Of Contents
- Table of contents
- 1 Dear Customer,
- 2 General data
- 3 General description
- 4 Safety
- 5 Installation and startup
- 5.1 Transport and unpacking
- 5.2 Disposal of packaging materials
- 5.3 Installation site
- 5.4 Commissioning
- 5.4.1 Functional elements
- 5.4.2 Supplied tools
- 5.4.3 Touch display description
- 5.4.4 Illumination of the processing chamber, LED light strip, and On/Off button
- 5.4.5 Using the processing chamber screen
- 5.4.6 Installation
- 5.4.6.1 Connecting to the PC via LAN
- 5.4.6.2 Connecting the unit to the power supply
- 5.4.6.3 Installing the unit
- 5.4.6.4 Connecting the suction device (optional)
- 5.4.6.5 Connecting to the PC via WLAN (option)
- 5.4.6.6 Operating several production units at one access point
- 5.4.6.7 Connecting to the PC via the wireless interface (optional)
- 5.4.7 Filling the water tank
- 5.4.8 Switching the unit ON and OFF
- 5.5 Repacking
- 5.6 Scope of supply
- 5.7 Storage
- 6 Operation
- 7 Service
- 7.1 Using the cleaning hose and the wet cleaning process
- 7.2 Changing filter bags and HEPA filters
- 7.3 Changing the water
- 7.4 Instruments
- 7.5 Care, cleaning agents, and disinfectants
- 7.6 Cleaning surfaces
- 7.7 Replacing the main fuses
- 7.8 Changing the filter
- 7.9 Removing water from the unit
- 7.10 Using the tank cap opener
- 8 Technical description
- 9 Disposal
- 10 Consumable
- Index
Dentsply Sirona
Operating Instructions CEREC Primemill
5 Installation and startup
5.3 Installation site
67 19 756 D3439
D3439.201.01.01.0209.2019
21
5.3
Installation site
1500mm
59”
1500mm
59”
1500mm
59”
1500mm
59”
1500mm
59”
1500mm
59”
1500mm
59”
1500mm
59”
1500mm
59”
1500mm
59”
1500mm
59”
CAUTION
Install out of the reach of patients!
Do not install or operate the production unit in the vicinity of the
patient (place it at least 1.5m away from the patient).
The production unit requires a level base of approx. 729mm x 465mm
(W x D). The height of the production unit is:
● with the processing chamber door closed: 454mm
● with the processing chamber door, open: 675 mm
Install the production unit so that the main switch is easily accessible.
Make sure that the ventilation slots underneath and at the back of the
unit remain unobstructed. The distance between the back of the unit
and the wall must at least be 10 cm.
Note the weight of 46kg!
The unit must not be installed at sites with a high level of humidity or
dust!