Operating Instructions
Table Of Contents
- Table of contents
- 1 Dear Customer,
- 2 General data
- 3 General description
- 4 Safety
- 5 Installation and startup
- 5.1 Transport and unpacking
- 5.2 Disposal of packaging materials
- 5.3 Installation site
- 5.4 Commissioning
- 5.4.1 Functional elements
- 5.4.2 Supplied tools
- 5.4.3 Touch display description
- 5.4.4 Illumination of the processing chamber, LED light strip, and On/Off button
- 5.4.5 Using the processing chamber screen
- 5.4.6 Installation
- 5.4.6.1 Connecting to the PC via LAN
- 5.4.6.2 Connecting the unit to the power supply
- 5.4.6.3 Installing the unit
- 5.4.6.4 Connecting the suction device (optional)
- 5.4.6.5 Connecting to the PC via WLAN (option)
- 5.4.6.6 Operating several production units at one access point
- 5.4.6.7 Connecting to the PC via the wireless interface (optional)
- 5.4.7 Filling the water tank
- 5.4.8 Switching the unit ON and OFF
- 5.5 Repacking
- 5.6 Scope of supply
- 5.7 Storage
- 6 Operation
- 7 Service
- 7.1 Using the cleaning hose and the wet cleaning process
- 7.2 Changing filter bags and HEPA filters
- 7.3 Changing the water
- 7.4 Instruments
- 7.5 Care, cleaning agents, and disinfectants
- 7.6 Cleaning surfaces
- 7.7 Replacing the main fuses
- 7.8 Changing the filter
- 7.9 Removing water from the unit
- 7.10 Using the tank cap opener
- 8 Technical description
- 9 Disposal
- 10 Consumable
- Index
Dentsply Sirona
Operating Instructions CEREC Primemill
5 Installation and startup
5.4 Commissioning
67 19 756 D3439
D3439.201.01.01.0209.2019
29
5.4.6 Installation
5.4.6.1
Connecting to the PC via LAN
An Ethernet port is located on the rear of the unit, which can be used to
connect the PC to the production unit. Use a network cable to do this
(LAN connection).
Using a network cable
Connect the PC to the LAN connection of the unit.
5.4.6.2
Connecting the unit to the power supply
NOTE
Grounded power outlet
The unit must be connected to a grounded power outlet.
➢ Connect the unit to the power supply using the supplied power
cable.
5.4.6.3
Installing the unit
The following steps must be performed before putting the unit into
operation.
5.4.6.3.1 Process steps that have to be taken on the unit.
ü The unit is connected to a power supply source and the main switch
on the rear of the unit is switched on.
1.
Switch the unit on by pressing the On/Off button at the front.
Ä A start screen will shortly appear on the touch display.
2.
Select the set-up language.
Ä The unit looks for a hub or a virtual software hub.
3.
If using a virtual software hub solution, make sure that the PC on
which the software hub is executed is switched on.
Ä The touch display displays information if the hub connection
has been established.
4.
If no hub or software hub is available, you can change the IP
settings of the CEREC Primemill without continuing the hub or
performing a manual hub search.
5.
Check the hub presets and change them if required.
6.
Check on the touch display whether or not an suction unit is
connected.