Instructions / Assembly
3
6a. Assemble a few of the balusters into the bottom and top
railings (make sure balusters are setting at 90°) and set this on
scrap material clearing the stair treads to determine where
bracket locations need to be. Measure to make sure that the
bottom railing will clear the stair treads and the top railing will
be aligned with Horizontal railing (remember in most cases,
longer post and post sleeve will be needed on lower section
of stair rail to accommodate stair angle).
6b. After locating appropriate position for
bottom rail remove top rail and balusters
and attach bottom rail stair bracket to
upper post using two
#3-15/16”
wood
screws and two
#5-1/2”
wood
screws(provided)
6c. Attach bottom stair rail stair bracket to lower
post using two
#3-15/16”
wood screws and two
#5-1/2”
wood screws (provided). For best results
set drill to low speed when installing these screws.
On the TOP RAIL, attach the top stair
bracket to the side with baluster holes. On
the BOTTOM RAIL, attach the top stair
bracket to the OPPOSITE SIDE of the
baluster holes. Attach both brackets using
one
#3/4”
self-drilling screws (provided).
5. On the TOP RAIL, attach the bottom
stair bracket to the side with baluster
holes. On the BOTTOM RAIL, attach
the bottom stair bracket to the
OPPOSITE SIDE of the baluster holes.
Attach both brackets by using one
#3/4”
self-drilling screws (provided).
4. Top rail baluster face down & bottom
rail baluster holes must face up.