Product Manual
22650 County Highway 6
P.O. Box 1708
Detroit Lakes, Minnesota 56502 USA
1-888-DIAL-SJE (1-888-342-5753)
Phone: 218-847-1317
Fax: 218-847-4617
E-mail: customer.service@sjerhombus.com
Instl. Instr. PN 1037463C
©SJE-Rhombus Printed in USA 12/14
ELECTRICAL SHOCK HAZARD
Disconnect power before installing or servicing this
product. A qualifi ed service person must install and
service this product according to applicable electrical
and plumbing codes.
EXPLOSION OR FIRE HAZARD
Do not use this product with fl ammable liquids.
Do not install in hazardous locations as defi ned by
National Electrical Code, ANSI/NFPA 70.
Failure to follow these precautions could result in serious injury or death. Replace product immediately if switch cable becomes damaged
or severed. Keep these instructions with warranty after installation. This product must be installed in accordance with National Electric Code,
ANSI/NFPA 70 so as to prevent moisture from entering or accumulating within boxes, conduit bodies, fi ttings, fl oat housing, or cable.
CORD SEAL INSTALL
1. Pass the cables through the 2" or 2½"
terminal adaptor.
2. Route cables through the seal,
leaving adequate cable to work with.
See Figure A.
NOTE: If all hole positions are not
used, plug open position(s) in the
cord seal with the PVC plug(s)
provided.
3. Insert the cord seal into the terminal
adaptor and tighten hex nut until
adequate strain relief is achieved.
4. Gather all ground wires, including
ground conductor on the cord seal
and secure to ground terminal.
For detailed specifi cations on this product, or for the complete line of SJE-Rhombus
®
panel, alarm, and switch products, visit our web-site at www.sjerhombus.com.
CABLE WEIGHT INSTALL
1. Lay cable in weight as shown in
Figure B.
2. Align clip with weight groove and
slide clip towards cable as shown
in Figure B. Snap clip snugly up
to cable and manually force clip to
tightest possible position.
3. See Figure C for proper tether
length.
CABLE CLAMP INSTALL
1. Determine the required cord
tether length according to product
specifi cations.
2. Place the cord into the clamp as
shown as shown in Figure D.
3. Locate clamp at desired activation
level and secure the clamp to the
discharge pipe as shown in
Figure D.
Note: Do not install cord under hose
clamp.
4. Tighten the hose clamp using
screwdriver. Over tightening may
result in damage to the plastic
clamp. Make sure the fl oat cable
is not allowed to touch the excess
hose clamp band during operation.
5. Wire switch as shown in the Wiring
Diagrams.
6. Check installation. Allow system to
cycle to insure proper operation.
Note: All hose clamp components
are made of 18-8 stainless steel
material. See your SJE-Rhombus
®
supplier for replacements.
Figure B
Figure A
FLOAT BRACKET INSTALL
1. Drill holes in mounting surface
1-5/16 inches apart.
2. Install fl oat bracket mounting device
as shown in Figure E.
NOTE: Use stainless steel
fasteners appropriate for the
mounting surface.
3. Determine fl oat switch cord length
to hang into tank to achieve proper
activation level.
4. Install fl oat switch cords to fl oat
bracket using strain relief connectors
as shown in Figure F.
5. Install fl oat bracket into fl oat bracket
mounting device while stowing
excess cable as shown in Figure F.
fl oat
switch
cable
weight
*Control Switches:
Recommended tether length is
4 inches (10 cm)
*Pump Switches:
Minimum recommended tether length
is 3.5 inches (9 cm)
tether
length*
Figure C
Figure D
Figure E
Figure F
strain relief
connector
PVC Plug
Cable
ĸ