User's Manual

Parking Column 1
Parking Column for System SPT 400 1.2
© SKIDATA AG, Version 1.0 Page 17
1.2.9 Earthing connection
The protective earth conductor of the lead must be attached to
the central earthing point by way of a ring lug.
After installation, ensure proper metal contact of all aluminium
parts, i.e. the cable lug and/or metal part (check by measur-
ing)
If necessary, mill off any aluminium parts at the contact point
to ensure proper conductivity (the resistance of the earth con-
ductor must not exceed 0.1 ȍ)
After connecting the earth conductor, proceed as follows:
Check the strain relief clamps for proper fit
Check to make sure the cables leading to the connection ter-
minals are properly placed in accordance with applicable
norms
Perform a visual check of the insulation to ensure it is in
proper condition
Fig. 11:
Earthing point
Fig. 12:
Protective earth
conductor