User's Manual

GLS MT Installation
4/1/2004 VER 2.8 DOC
7
Visually verify a bond has been obtained between the bracket and
the roof.
9. Firmly tighten all four MT bracket mounting screws. Allow 15
minutes for the adhesive to set before testing the bond.
Firmly pull up on the MT/Bracket assembly, to verify a secure
bond to the roof of the trailer, before releasing the trailer into
service.
10. Install the tether guard over the tether. Orient the guard with
the raised section over the tether and the VHB tape section toward the
front of the trailer. Remove the plastic film from the Tether Guard
VHB tape to expose the VHB tape adhesive.
Be careful not to touch the exposed adhesive or primed surface as
any contamination will impede the bond strength.
Carefully place the Tether Guard, over the Tether, on the roof.
Firmly push down, back and forth several times, along the entire
length of the Tether Guard.
A
pply RTV at
FRONT
Firmly apply pressure along
the len
g
th of the Tether Guard
Expose the
VHB Tape
adhesive and
install the
Tether Guard
FRONT
Firmly pull up on the Tether Guard, to verify a secure bond to the
roof of the trailer, before releasing the trailer into service.
11. Use a generous amount of RTV to seal around the head of the
Tether mounting screw. Also apply RTV to each end of the tether
where the tether passes through the grommets. Finally apply RTV to
each end of the Tether Guard where the Tether makes contact with the
Tether Guard.