Owners manual
Component Box Breakdown:
Part #: TU730STBB / TU730STBH / TU730STBM / TU730STBN
Hardware Bag Breakdown:
Part # HB-916
Item # Description Qty
916FTN 9/16 FINE THREAD LOCK NUT 8
Item # Description Qty Item # Description Qty
TU713STS TOYOTA 1"-3" ADJ FRT STRUT 2 M9562 MONOTUBE SHOCK 2
RBF125 1.25" REAR LIFT BLOCK 2 (Included With TU730STBM Box)
916X212X834U 9/16 X 2 1/2 X 8 3/4 U-BOLT 4 N8062 NITRO SHOCK W/ RED BOOT 2
HB-916 HDWR BAG: 9/16 FINE THR NUT 1 (Included With TU730STBN Box)
B8562 BLK MAX SHOCK W/BLK BOOT 2 I-TU730STB INST SHEET: TU730STB 1
(Included With TU730STBB Box)
H7062 HYDRO SHOCK W/RED BOOT 2
(Included With TU730STBH Box)
Pg 2I-TU730STB
Front Installation:
1. With the vehicle on flat level ground, set the emergency brake, &
block the rear tires / wheels.
2. Raise the front of the vehicle & support the vehicle securely using
jack stands.
3. Remove the front tires / wheels. (See Photo # 1)
4. Remove the OEM ABS lines from the OEM upper A-arms &
disconnect the OEM ABS / brake lines from the OEM steering
knuckles.
5. Disconnect the OEM outer tie rods from the OEM steering
knuckles using a tie rod remover or other suitable tool.
6. Disconnect the OEM sway bar end links from the OEM steering
knuckles.
7. Disconnect the lower strut mounts
from the OEM lower A-arms. (See
Photo #2).
8. Disconnect the OEM upper A-arms
from the OEM steering knuckles
using a ball joint remover or other
suitable tool. (See Photo # 3)
Photo # 3
Photo # 1
Photo # 2