Owner manual
Section 5 - Attachments
5-4131200352
Operation:
• Close bucket gate, level bucket and fully retract and lower boom to load material.
• Distribute material evenly within the bucket.
• Travel in accordance with requirements set forth in Section 1 - General Safety
Practices.
• Open gate to dump load in desired location.
Equipment Damage Precautions:
• Transport the concrete bucket as low as practical at a slow speed and without
rapid side to side movement.