Manual

CHS Series CHS 300-399 Common Venting Slant Fin Corp.
8
Floor Stand Mounting Method
CHS’s Floor Stands and Twinning Kits are designed with precise height and spacing for assembling the Common
Vent Manifold System. One Twinning Kit is required to joint two Floor Stands together; two Twinning Kits are
required to join three Floor Stands together.
P/N 818 169 CHS 300-399 Floor Stand
P/N 818 220 Floor Stand Twinning Kit
1. Follow the directions outlined in the CHS Floor Stand installation instructions to assemble the individual
Floor Stands, and connect together using the Twinning Kit(s). Once assembled, ensure the bolts are
fastened securely. Level the assembled stand vertically and horizontally using the adjustable leveling legs.
Figure 3-3 CHS’s Floor Stands & Connector Kits
2. Secure the assembled Floor Stand to the floor using the provided Floor Anchor Brackets and field
supplied anchors, see installation instructions provided with the Floor Stand.
3. Install the boilers on the Floor Stands see Figure 3-4.
Figure 3-4 Boilers Floor Stand Mounted
(Model CHS 300-399 Shown)
4. Secure bottom bracket to the boiler and center cross member of the stand, refer to the CHS Floor Stand
installation instructions.
Twinning Kit
Floor Stand
Flue Outlet
Air-Inlet