Owner's manual

The installation must conform to the requirements of
the authority having jurisdiction or, in the absence of
such requirements, to the National Fuel Gas Code,
ANSI Z223.1-latest edition. The installation must also
conform to the additional requirements in this Slant/Fin
Instruction Book.
In addition where required by the authority having juris-
diction, the installation must conform to American
Society of Mechanical Engineers Safety Code for
Controls and Safety Devices for Automatically Fired
Boilers, No. CSD-1.
WARNING
This boiler, gas piping and accessories must be
installed, connected, serviced and repaired by a
trained, experienced service technician, familiar with all
precautions required for gas-fired equipment and
licensed or otherwise qualified, in compliance with the
authority having jurisdiction.
WARNING
The venting system of this boiler is under positive pres-
sure. Leakage from this system can be hazardous and if
not avoided can result in death or serious injury. In addition
to the recommendations within this manual and the User’s
Information Manual, the venting system, from the flue col-
lector to the outdoor discharge, must be carefully checked
annually by a qualified service agency.
This manual must be left with owner and should be hung on
or adjacent to the boiler for reference.
LYNX
INSTALLATION AND OPERATING INSTRUCTIONS
Printed in U.S.A. 1214 Part No. 81-5001000 Publication No. LX1-40 Rev. F
Heating Contractor
Address
Phone Number
Boiler Model Number
Boiler Serial Number
Installation Date
DIRECT-VENT SEALED COMBUSTION CONDENSING BOILER
HOT WATER MODEL LX-90, LX-120 & LX-150
GAS-FIRED BOILERS FOR NATURAL AND L.P. PROPANE GASES
TABLE OF CONTENTS
Dimensions, Rating and Orifice Sizes ........................................2
Identification of Parts ........................................................................3
Installation Requirements .................................................................4
Contamination Prevention.................................................................5
Mounting the boiler on a wall............................................................6
Venting Application ...........................................................................6
Boiler Room Air Supply and Ventilation............................................6
Flue Gas Venting Requirements.......................................................7
Additional Installation Requirements for Massachusetts..................7
Vent and Air Intake Material .............................................................8
PVC/CPVC Pipe General Assembly Method....................................8
Vent and Air Intake Restrictions .......................................................8
Sidewall Venting, Non-Direct Vent ..................................................10
Vent Termination Location and Clearance......................................10
Non-Direct Vent Installation ............................................................10
Direct Vent Installation ....................................................................10
Sidewall Venting, Direct Vent ..........................................................10
Vent/Air Intake Termination Installation...........................................16
Direct Vent, Venting and Air Intake through a Roof........................17
Venting and Air Intake Regular Inspection .....................................18
Condensate Removal System ........................................................18
Gas Piping ......................................................................................18
Electrical Wiring ..............................................................................19
Wiring Diagram...............................................................................20
Single and Multi Zoning..................................................................22
Water Piping ...................................................................................24
Operating Instructions.....................................................................30
Boiler Control and Display..............................................................30
Boiler Operating Status ..................................................................31
Viewing and changing temperature................................................32
Viewing and changing system setting ............................................33
Initial start and operating instruction ..............................................35
Sequence of Operation...................................................................36
Combustion check and fuel input rate ............................................37
Safety Check .................................................................................37
Diagnostic error codes ...................................................................38
Care and Maintenance ...................................................................41
General Troubleshooting Guide ......................................................42
WARNING
SEE “WARNING” ON PAGE 4 FOR LIQUEFIED
PETROLEUM (L.P.) PROPANE GAS-FIRED BOILERS
IMPORTANT
READ ALL OF THE FOLLOWING WARNINGS
AND STATEMENTS BEFORE READING THE
INSTALLATION INSTRUCTIONS

Summary of content (44 pages)