Instructions / Assembly

If you are installing a " Follow the grade" style fence and have a string-line stretched from
among 5 sections then at this point you would align one stringer with the string-line and
measure the other stringer to be spaced 51" apart from the top of your bottom stringer to
the top of your top stringer. This will achieve an even space between top and bottom
stringers all along your fence line project.
NOTES
The best tool to be used here is a half-inch open end socket wrench. Because it is
thin enough to get in under the stringer and quick like a socket wrench.
If you need to dip or climb your fence section because of elevation changes in the
grade of your property, you may want to install a "step" section or "rack" your
fence. This will require some longer fence boards and some longer posts to
accommodate the drastic elevation changes in your fence project.
Also, please see Hills, Swales and Changes in Ground Elevation in FAQ section of
the website.