Installation Guide

3
Mount Frame to Wall
4
Triple Station
Double Station
FINISHED FLOOR
D
(See VARIABLE
MOUNTING
HEIGHT CHART
On Page 2)
C
For triple station sinks, reinstall the Front Panel
Support.
A
If desired, apply adhesive to back
surfaces of Frame.
B
Mount Frame to wall using 3/8" fasteners with 1000 lb min
pull out strength in the following locations:
1. Each hole in the extreme outer corners of top support
2. One of either of the two holes in the top position of each upright
3. The lower hole location in each upright
Fasteners may be optionally applied to any of the remaining mounting
hole locations.
Level Frame in both directions before tightening fasteners securely.
4
Mount Basin to Frame
A
Mount Basin to Frame using 1/4”-20 x 1/2” SEMS fasteners.
B
If desired, apply caulk between Basin and wall.
Triple StationDouble Station
1/4”-20 x 1/2” Pan Head Screw (SEMS)
(Actual Size)
Note: If desired, Grid Strainers, Faucets and Soap Dispensers may be
installed prior to mounting Basin to the Frame. Refer to Steps 5 and 6.
Front Panel Support
D
For installations including the optional SJS-1650 Soap Dispenser,
refer to Soap Dispenser Pump Mounting Instructions on Page 6.