Sunny Tripower Installation Manual
Table Of Contents
- 1 Information on this Document
- 2 Safety
- 3 Scope of Delivery
- 4 Product Description
- 5 Mounting
- 6 Electrical Connection
- 6.1 Safety during Electrical Connection
- 6.2 Overview of the Connection Area
- 6.3 Connecting Conduits to the Connection Unit
- 6.4 Connecting the Grounding Conductor
- 6.5 Connecting the PV Array to the Connection Unit 600-US
- 6.6 Connecting the PV Array to the Connection Unit 1000-US
- 6.7 Operating the Reverse Polarity Detection
- 6.8 Connecting the DC Output Cable for the Inverter to the Connection Unit
- 7 Commissioning
- 8 Disconnecting the Connection Unit from Voltage Sources
- 9 Troubleshooting
- 10 Decommissioning
- 11 Technical Data
- 12 Accessories
- 13 Contact
SMA America, LLC 5 Mounting
Installation Manual CU600-1000US-IA-en-10 25
5.3 Mounting the Connection Unit to a Post
Additionally required mounting material (not included in the scope of delivery):
☐ 2 screws suitable for the building ground
☐ 2 washers to match the screws
☐ 2 screw anchors suitable for the building ground and the screws.
Procedure:
1. Position the Connection Unit on the post.
2. Mark the drill hole positions by means of the oblong holes in the brackets of the Connection
Unit. Use at least one of the oblong holes at the top and at the bottom.
3. Remove the Connection Unit from the post.
4. Drill holes at the markings.
5. Insert suitable screw anchors into the drill holes.
6. Insert screws with washers through the oblong
holes of the Connection Unit into the drill holes.
7. Tighten the screws. Ensure that no screws are loose.
8. Ensure that the Connection Unit is firmly positioned.
Damage to the Connection Unit due to moisture and dust intrusion
Dust or moisture intrusion can damage the Connection Unit.
• Only mount the Connection Unit with its lid closed and with inserted filler plugs.