5.2 Connecting the Sunny Boy to the public grid (AC)
Cable Design
The conductor cross-section should be dimensioned in a way that output losses do not exceed 1% at
nominal power. Use "Sunny Design" (www.SMA.de/en/SunnyDesign) for this.
The maximum cable lengths relative to the conductor cross-section are shown in the following table.
The conductor cross-section required in individual cases depends on the following factors:
ambient temperature,
•routing method,
•UV resistance,
line losses,
valid installation guidelines of the respective country (of the installation site).
Cable Requirements
Connection requirements of the grid operator
Comply with the connection requirements of your utility operator.
Conductor cross-section Maximum cable length
SB 1100 SB 1200 SB 1700
1.5 mm² 21 m 18 m 15 m
2.5 mm² 35 m 30 m 22.5 m
Position Designation Value
A External diameter 9 ...17 mm
B Conductor cross-section max. 2.5 mm²
C Strip insulation 4 ... 5 mm