Installation Instructions

Security SMA Solar Technology AG
8 SB11_12_17-IEN100132 Installation Guide
Certified Countries
The Sunny Boy 1100 / 1200 / 1700 (with according configuration) fulfill the requirements specified
in the following standards and directives (dated: July/2009):
VDE 0126-1-1 (02.2006)
G83/1 (09.2003)
CER/06/190 (10.2006)
E 2750 (11.2004)
PPC (06.2006)
EN 50438 (12.2007)
C10/C11 (08.2003)
AS4777 (2005)
•MEA
IEC-utility Meeting 216
SMA Solar Technology can preset special grid parameters for other countries / installation locations
according to customer request, after evaluation by SMA Solar Technology.
You can later make modifications yourself by changing software parameters with respective
communication products (e.g. Sunny Data Control). A personal password is required for this, which
you can obtain from the Serviceline upon request.