Installation Guide

ATTENTION! READ BEFORE INSTALLING!
FOR BEST VISUAL REPRESENTATION OF YOUR FLOOR
ooring replicates the look of a natural product which has natural variations in color, texture, and sheen/gloss.
another.
SUBFLOOR PREPARATION
Subfloor should be dry and level to 3/16” per 10 ft. radius for best installation results.
Angle-Tap Installation Instructions for SMARTCORE
TM
Floors
READ THESE INSTRUCTIONS THOROUGHLY BEFORE BEGINNING INSTALLATION. If the following instructions leave any
unanswered questions or if additional information is required, please call Natural Floors toll free at 800-404-2675 (706-733-6120).
FLOORING MATERIAL SHOULD BE INSPECTED PRIOR TO INSTALLATION
assumed by Natural Floors, since Natural Floors has no control over the installer’s proper application. Should an individual plank
or tile be doubtful as to appearance or dimension the installer should not use this piece. Natural Floors will send a replacement in
a timely fashion.
NOTE:
to determine if suitable for use with this material.
READ BEFORE INSTALLING
While SMARTCORE is waterproof, it’s not a moisture barrier. It’s still a good idea to make sure concrete is cured and tested for
moisture and that a moisture barrier is installed in the crawl space and even under a SMAR oor.
Moisture won’t damage SMARTCORE, but it can get in the walls and structure of the home. A couple of extra dollars and a few
minutes is a small investment for the added protection and peace of mind.
Because houses and buildings, as well as adjacent hardwood or laminate oors, expand and contract, Natural Floors
recommends to leave a ¼” expansion gap between the perimeter walls and any adjacent hardwood oor.
Natural Floors recommends using the glue down method when installing SMARTCORE where it will be exposed to temperatures
greater than 140° F (60° C) or below 32° F (0° C).
Use good common sense installation practices, and you’ll have a successful installation that results in a beautiful oor.
PRE-INSTALLATION JOBSITE REQUIREMENTS
Natural Floors cannot be held responsible for site conditions.
y. Ensure adequate lighting for proper
ooring is not acceptable, contact your supplier immediately and arrange for a replacement. Natural Floors cannot
oor conditions.
Flooring should be one of the last items installed in any new construction or remodel project.
Crawl spaces must be a minimum of 18′′ (46 cm) from the ground to the underside of the joists. A ground cover of 6–20 mil black
lm is essential as a vapor barrier. Joints must be lapped 6′′ (15 cm) and sealed with moisture resistant tape. The
crawl space should have perimeter venting equal to a minimum of 1.5% of the crawl space square footage. These vents should be
properly located to foster cross ventilation. Where necessary, local regulations prevail.
Room temperature and humidity of installation areas should be consistent with normal, year-round living conditions for at least
ooring. Maintaining an optimum room temperature of 70° F and a humidity range of 30-50% is
recommended.
PRE-INSTALLATION SUBFLOOR REQUIREMENTS
Dry
Structurally sound
Clean: Thoroughly swept and free of all debris
Level: Flat to 3/16” per 10-foot radius
Portland leveling compound.
, in good condition, clean, and level. Do not sand
be installed on
all levels of the
home.
1
TM

Summary of content (4 pages)