Ultra Rail Installation Manual

snapnrack.com
11
Pre-Installation Requirements
X-AXIS
Y-AXIS
System Layout
1) Transfer the array layout to the roof using a roof marking crayon to mark the inside and outside corners of the array.
2) Locate the estimated roof framing member positions and mark them in the array area with a roof marking crayon.
3) Transfer rail locations using a chalk line.
4) Mark roof attachment locations on the roof, noting that attachments will be located at intersections of rails and roof
framing members. Layout rails such that module frames do not overhang mounting rails more than specified by module
manufacturer, more than 30% of total module length, or more than required by the Class A Fire Certification (see Certification
Details section).
Ensure final roof attachment locations do not exceed the maximum attachment spacing and cantilever specified in the design.
Layout Note: