Ultra Rail Installation Manual
15
Tile Replacement
INSTALLATION INSTRUCTIONS
1) Using roof attachment locations
drawn during system layout,
remove roof tile where the roof
attachment will be installed. Slide
riser assembly into base channel
and snug by hand.
2) Locate base over rafter using
riser position and Diagram 1 with
measurements found in Table 1,
then drill two pilot holes through
the roofing material into the roof
framing member.
Flashing can be used as a template for
locating riser.
Best Practice:
Tile Profile Riser Center
to Tile Front
Edge (A)
Riser Center
Side – Side
(B)
S 8.25” Center of peak
W 8” Center of peak
Flat 8” 5”
Table 1
Diagram 1
B
A
Base can be flipped and neighboring
tile may need to be removed to attach
to the roof framing member and line
up riser with flashing.
Working from RIGHT TO LEFT and UP
THE ROOF will prevent neighboring
tiles from lifting flashings.
Install Note:
3) Apply roofing sealant and attach
the base with (2) 5/16” lag screws,
drive lag screws for minimum 2.5”
embedment into the roof framing
member.
4) If deck level flashing is required,
install flexible flashing per the Deck
Level Flashing for Tile Replacement
Installation Manual.
5) Align the riser with the hole in
the flashing and tighten riser.