Ultra Rail Installation Manual

snapnrack.com
26
Module Installation
INSTALLATION INSTRUCTIONS
1) Snap the channel nut into the top
channel of the rail.
2) Slide the clamp flush to the
module with the top lip of the mid
clamp over the top edge of the
module frame.
3) Place the next module flush to
the other side of the mid clamp.
4) Tighten hardware.
SnapNrack Mid Clamp
Mid clamps create 1/2” gap between
modules.
Install Note:
Take care to avoid having wires
pinched between modules and rails, as
this can lead to system failure and be
dangerous.
Install Note:
Mid clamps are Listed with and
without springs.
Install Note:
Backing channel nut o bolt will ease
installation into rail channel.
Best Practice: