Ultra Rail Installation Manual
snapnrack.com
30
Rail Finishing
INSTALLATION INSTRUCTIONS
1) Slide the Rail Cutting Tool over
the end of the rail and place it so
that the upper lip is safely covering
the edge of the module (optional).
2) Use the reciprocating saw or
band saw to cut o the end of the
rail (optional).
3) Remove the Cutting Tool from
the rail (optional).
4) Insert SnapNrack Ultra Rail End
Cap into the cut end of the rail to
create a flush finish to the array.