Ultra Rail Installation Manual
snapnrack.com
37
MLPE Installation
INSTALLATION INSTRUCTIONS - SOLAREDGE FRAME MOUNT
1) Locate the SolarEdge optimizer
with Frame-Mounted Module Add-
On at a location on the module
frame that will not interfere with
the SnapNrack rail.
2) Install the optimizer mounting
plate onto the module frame and
tighten hardware.
3) Connect the module leads to the
input connectors on the optimizer.
Refer to the SolarEdge optimizer
Frame-Mounted Module Add-On
installation guide for additional
instructions.
Install Note:
INSTALLATION INSTRUCTIONS - ENPHASE FRAME MOUNT
1) Locate the Enphase Frame Mount
bracket clamp at a location on the
module frame that will not interfere
with the SnapNrack rail.
2) Slide the microinverter unit onto
the bracket clamp, then move it
slightly to the left.
3) Tighten hardware to 13 ft-lbs
The microinverter mounting flange
should be on the outside of the
module frame.
Install Note:
4) Connect the module leads to the
microinverter DC connectors.
Refer to the Enphase Frame Mount
installation guide for additional
instructions.
Install Note: