Triple Bag Catcher with Turbo Operator's Manual

Turbo Installation
1. Remove and discard existing baffle from the left side
of the mower deck. It is replaced by turbo baffles.
2. Install the left (23-1/2” long) baffle and right (26-1/2”
front baffle (A and B, Figure 1) using six carriage
bolts (C), lockwashers (D), and nuts (E). Be sure the
bolts are inserted fully into the slots in the mower
deck.
Install Front Baffles
D
E
E
B
Figure 1. Install Front Baffles
A. Left Front Baffle (23-1/2” Long)
B. Right Front Baffle (26-1/2” Long)
C. 5/16-18 x 3/4 Carriage Bolts
D. Lockwashers
E. 5/16-18 Nuts
1. Remove the deflector, spring, and hinge assembly.
Use a hammer to drive the carriage bolts back
through the deck, and discard the deflector.
2. Install the hook plate (A, Figure 2) below the stone
guard (located at the bottom of the discharge open-
ing) using two carriage bolts (B) and flange locknuts
(C). Install bolts from the bottom up.
3. Install retainer nut (D) on hook plate.
Install Hook Plate
WARNING
Before beginning any service work turn off the
PTO, set the parking brake, turn off the ignition,
and disconnect the spark plug wire(s).
D
B
C
C
Stone
Guard
Stone
Guard
Figure 2. Install Hook Plate
A. Hook Plate
B. 5/16-18 x 3/4 Carriage Bolts
C. Flange Locknuts
D. Retainer Nut
D
C
A
C
6
A