Chapter 5 System Running
5.1 Check before Power-On
Check before power-on shall be conducted to ensure the normal operation of
SNE9610 after power-on.
Check that SNE9610 has been installed in place.
Check that all cables between SNE9610 and other devices are connected
correctly and firmly
Check that RS485 communication cables of SNE9610 are connected correctly
and firmly
Check that cables are bundled neatly and beautifully. The cable ties are evenly
distributed with proper tightness and same direction.
5.2 System Power-On
Supply the power to SNE9610 and close the switch on the AC socket of the
power adapter.
Observe the RUN indicator light of SNE9610.