User guide

Maintenance
Section
4-1A38E Work Platform
4.0 Introduction
Be sure to read, understand and follow all
information in the
Operation Section of
this manual before attempting to operate or
perform service on any A38E Work Platform.
This section contains instructions for the
maintenance of the A38E Series Work Platform.
Procedures for scheduled maintenance and repair/
removal are included.
Referring to Section 3.0 and Section 6.0 will aid in
understanding the operation and function of the
various components and system
s of the A38E Work
Platform and help in diagnosing and repair of the
machine.
Refer to Table 4-1, the Preventative Maintenance
Checklist for the recommended Maintenance
intervals.
TOOLS REQUIRED
The following is a list of items which may be required
to perform certain maintenance & repair procedures
on the A38E Work Platform.
1 x Multi-meter capable of reading Voltage, Ohms
and Amps.
1 x Hydraulic Pressure Gauge
- Range (0 - 3000 PSI)
4.1 Preventative Maintenance
(Table 4-1)
The complete inspection consists of periodic visual
and operational checks, together with all necessary
minor adjustments to assure proper performance.
Daily inspection will prevent abnormal wear and
prolong the life of all
systems. The inspection and
maintenance schedule is to be performed at regular
intervals.
Inspection and maintenance shall be performed by
personnel who are trained and familiar with
mechanical and electrical procedures. Complete
descriptions of the procedures are in the text
following the table.
The Preventa
tive Maintenance table has been
designed primarily to be used for machine service
and maintenance repair.
Please copy the following page and use this
table as a checklist when inspecting a machine
for service.
WARNING
Before performing preventative maintenance
familiarise yourself with the operation of the
machine.
Ensure that the machine is fully secured
and supported when carrying out
maintenance procedures in the elevated
position.
WARNING
4.0
1 x MOBA Calibration ā€˜Teach Inā€™ Handset.