User Manual
© Trynex International 2009 L1186
8 — 26
Operating the Spreader
SP-2400 INTERIOR BAFFLE and INVERTED-V INSTRUCTIONS
• The SP-2400 uses a multi-function bae system over the auger area.
. This twin bae design is used to reduce load on the auger drive train which controls amperage load to the electrical
system.
It must not be removed unless servicing the unit.
• WARNING: Always disconnect power source before attempting to
remove material bae.
• There are two covers provided, one long and one short. They can be removed in dierent combinations depending on the
material type or moisture content. Ultimately they aid in controlling material ow to the auger area; however for wet sand
both baes should be removed.
. The bae system is also connected to the vibrator link arm assembly to assist with material ow. Make sure vibrator
bolts and link arm hardware are tight before operating spreader.
Short Bae
Long Bae
Connect To Link Arm
Model # SP-2400