Stacking Sol-Ark 15K @ 120V/240V Outputs
Parallel 15Ks
Continuous
With PV
(kW)
Continuous
With No PV
(kW)
Grid Input
Pass Through
(A)
Peak 10sec
(VA)
1
15
12
200
30
2
30
24
400
60
3
45
36
600
90
4
60
48
800
120
5
75
60
1000
150
6
90
72
1200
180
7
105
84
1400
210
8
120
96
1600
240
9
135
108
1800
270
10
150
120
2000
300
11
165
132
2200
330
12
180
144
2400
360
Stacking Sol-Ark 15K @ 120V/208V Outputs (3-phase)
Parallel 15Ks
Continuous
With PV
(kW)
Continuous
With No PV
(kW)
Grid Input
Pass Through
(A)
Peak 10sec
(VA)
1*
15
12
200
30
2**
30
24
400
60
3
45
36
600
90
6
90
72
1200
180
9
135
108
1800
270
12
180
144
2400
360
*Two phases only **Three phases but unbalanced (7.5kW, 15kW, 7.5kW)
MUST wire load outputs in parallel for systems to work correctly!
E. Communication lines must be connected between parallel units, as shown in the wire diagrams section
a. Preferred shielded CAT 6 cable for this purpose
F. Program all units to "Parallel" in the "Basic Setup" screen under the "Parallel" tab
b. Set one system to "Master" | Modbus SN: 1
c. Set all others to "Slave" | Modbus SN: 2,3,4…
d. Phases B/C for 120V/208V installations only
e. Power up slaves first, then Master
i. You will get an F29 or F41 error until both slaves and Master are on
Note: You must always fully power cycle all inverters after enabling or disabling parallel settings.
Check Pg. 24 for more info on Power cycling
G. Ensure the Generator is connected to all systems in parallel (if applicable).