Installation Guide Manual
Table Of Contents
- Disclaimers
- Support and Contact Information
- Revision History
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Commissioning the Installation
- Chapter 6: User Interface
- Chapter 7: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: External Fan Maintenance and Replacement
- Appendix D: Replacing and Adding System Components
- Appendix E: Determining the Circuit Breaker Size
- Technical Specifications - Single Phase Inverters (North America)
- Technical Specifications - Three Phase Inverters (North America)
CAUTION!
All PV modules must be connected to a power optimizer.
ATTENTION!
Tous les modules doivent être connectés à un optimiseur de puissance.
CAUTION!
If you intend to mount the optimizers directly to the module or module frame,
first consult the module manufacturer for guidance regarding the mounting
location and the impact, if any, on module warranty. Drilling holes in the
module frame should be done according to the module manufacturer
instructions.
ATTENTION!
Pour installation à même le module ou la monture du module, consultez
d'abord le fabricant du module sur la position et son impact sur la garantie du
module. Le perçage de trous dans le cadre du module devra se faire suivant les
instructions du fabricant.
CAUTION!
Installing a SolarEdge system without ensuring compatibility of the module
connectors with the optimizer connectors may be unsafe and could cause
functionality problems such as ground faults, resulting in inverter shut down. To
ensure mechanical compatibility of the power optimizers’ connectors with the PV
modules’ connectors to which they are connected:
Use identical connectors from the same manufacturer and of the same
type on both the power optimizers and on the modules; or
Verify that the connectors are compatible in the following way:
The module connector manufacturer should explicitly verify
compatibility with the SolarEdge optimizer connector; and
A third-party test report by one of the listed external labs (TUV,
VDE, Bureau Veritas UL, CSA, InterTek) should be
obtained,verifying the compatibility of the
connectors.
For more information, refer to
https://www.solaredge.com/sites/default/files/optimizer-input-
connector-compatibility.pdf
-Three Phase System Installation Guide MAN-01-00002-4.3
20 Safety