Installation Manual

Revision History
Version 1.1 (July 2018)
l Updateofproductnames
l Recommendationtomountthepoweroptimizerinalocationprotectedfromdirectsunlight
l DCSafetyUnitbrackethas3mountingholes
l Updateregardinguseofextensioncablesinpoweroptimizerinstallationguidelines
l Additionofcaution-installationinsalineenvironment
l Recommendationtomountthepoweroptimizerinalocationprotectedfromdirectsunlight
l Additionofpossibilitytousecompatibleconnectorsfromthird-partymanufacturers
l Poweroptimizerclearance-noclearanceisrequiredonthemountingbracketside
l Additionofreferencetotroubleshootingundetecteddevicesapplicationnote
l Torqueforgroundingusingtheequipmentgroundingbus-bar:3.4N*M/30lb-in
l Setupmode:TousetheLCDbuttonswhentheinvertercoverisremoved,touchthewhitedotson
theLCDbuttonframes.
l RemovedFerritebeadonACwires
l AdditionoflinktotheDesignerwebpage
l Updatedwarningaboutsealingunusedpoweroptimizerinputconnectors
l Outputsafevoltageis1V0.1V)
l Additionofmountingbrackettype2
l Mechanicalspecifications:Additionofinvertermodels(10kWand11.4kW)
l UpdatedtheSafetysection:
o
Newwarning:TheSafetySwitchmeetsallrequirementsforacode-compliantinstallationofthis
system.TheDCDisconnectSwitchdisconnectsboththepositiveandnegativeconductors.
o
Newimportantsafetyfeatureinformationforinverterswithautomaticrapidshutdown(PVRSS)
l Overviewsectionupdated(systemimage,additionalsafetyvoltageinitiator:RapidShutdown
(PVRSS))
l InSupportedACGrids,added:Groundconnectionisrequiredforallgrids
l InPowerOptimizerInstallationchapter:
o
Addedgroundingmethodtestinginformation
o
Added:circuitconductorsmustbesizedaccordingtoNEC690.9whencombiningstrings
o
Removedreferencetorackingmodelsandtheirgroundingmethods
o
Removedmentioningoftracker
l IninverterInstallationchapter:
o
InInverterInterfaces-updatedON/OFFswitchdescription,addedwarningregardingPVRSS
o
AddedacautionaboutnotalteringtheDCSafetyUnitenclosure:SolarEdgedoesnotpermit
openingorpuncturingtheSafetySwitchinanylocationotherthanthepre-defineddrillguide
locations,orotherwisealteringtheconstructionoftheenclosure,asthismaycompromisesafety
andwillvoidthewarranty.
l Connectionto/fromtheSafetySwitch:
o
ACgroundingtobus-barinsteadofterminalblock-updatedinstructionsandSafetySwitchimage
o
Stringfusingrequirementnoteupdated:Fusesneededfor4stringsormore(insteadof3).
o
Addedconduitsealingrequirement
Single Phase Inverter with HD-Wave Technology Installation MAN-01-00306-1.1
2
Revision History