Install Manual

Table Of Contents
l Logical Layout:Showsaschematictree-layoutofthecomponentsinthesystem,suchas:inverters,
strings,modules,metersandsensors,aswellastheirelectricalconnectivity.Thisviewenablesyouto
seewhichmodulesareconnectedineachstring,whichstringsareconnectedtoeachinverter,andso
on.
l Physical Layout:Providesabird'seyeviewoftheactualplacementofmodulesinthesite,andallows
pinpointissuestotheexactlocationofeachmoduleonavirtualsitemap.
Ifyoudonotreportthemappingoftheinstalledpoweroptimizers,themonitoringplatformwillshow
thelogicallayoutindicatingwhichpoweroptimizersareconnectedtowhichinverter,butwillnotshow
stringsorthephysicallocationofpoweroptimizers.
Themonitoringplatformincludesabuilt-inhelpsystem,thatguidesyouthroughthe
monitoringfunctionality.
Formoreinformation,refertohttps://www.solaredge.com/products/pv-
monitoring#/.
Creating Logical and Physical Layout using
Installation Information
Todisplayalogicallayout,inserttheinverterserialnumberinthenewsitecreatedinthemonitoring
platform.Whenthecommunicationbetweentheinverterandthemonitoringserverisestablished,the
logicallayoutisdisplayed.
Todisplayaphysicallayout,youneedtomapthelocationsoftheinstalledpoweroptimizers.Tomapthe
locations,useoneofthemethodsdescribedinthenextsections.
Designer
Designerrecommendsinverterandpoweroptimizerselectionpersitesizeandenables
reportgeneration.YoucancreateaprojectinDesignerandexportthesitedesignwith
thestringlayouttothemonitoringplatform.
Formoreinformation,refertohttps://www.solaredge.com/products/installer-
tools/designer#/.
Mapper Application
UsetheMappersmartphoneapplicationtoscanthepoweroptimizerandinverter2Dbar-codesand
createavirtualmapofaPVsiteforenhancedmonitoringandeasiermaintenance.
ThMapperapplicationisintegratedwiththemonitoringplatformandenables:
l Simpleon-siteregistrationofnewsystems.
l Creating,editingandverifyingsystemphysicallayout.
l Scanningandassigningthepoweroptimizerserialnumbertothecorrectmoduleinthesystem
physicallayout.
Fordetailedinformation,refertotheMapperdemomovies:
l CreatingnewsitesusingtheMappermobileapplication
-Single Phase Inverter with HD-Wave Technology Installation MAN-01-00541-1.0
42
Creating Logical and Physical Layout using Installation Information