Install Manual
Table Of Contents
- Disclaimers
- Revision History
- Support and Contact Information
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimisers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter SetApp
- Chapter 6: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: Replacing and Adding System Components
- Technical Specifications - Single Phase Inverters with HD-Wave Technology (No...
Verifying the Connection
Afterconnectingandconfiguringacommunicationoption,performthefollowingstepstocheckthat
theconnectiontothemonitoringserverhasbeensuccessfullyestablished.
1.
AccesstheStatusscreen:
a. IfnotalreadyON-turnONACtotheinverterbyturningONthecircuitbreakeronthemain
distributionpanel.
b.
OpenSetAppandfollowtheinstructionsonthescreen(scantheinverterbar-code;movethe
ON/OFF/PswitchtoPposition(forlessthan5sec)andrelease).
ThemobiledevicecreatesaWi-Ficonnectionwiththeinverteranddisplaysthemain
Commissioningscreen.
2.
CheckthatS_OK-Server Connectedstatusappearsinthemaininvertersection:
Status
Inverter
SN 07318000C
Power Voltage Frequency
Optimizers Connected
S_OK
Server Connected
Status
Production
Switch
ON
CosPhi
1.00
Limit
No Limit
Country
USA2
Voltage Temp Fan
Commissioning
3.
ScrolldowntotheCommunicationsectionandcheckthatthecommunicationoptionsareas
required.FormoreinformationrefertoCommunicationStatusonpage40.
Communication
LAN
Connected
RS485-1
SE Slave
NC
RS485-2
Modbus
2 of 2
Cellular
N/A
Wi-Fi
NC
ZigBee
NC
Chapter 6: Setting Up Communication
-Single Phase Inverter with HD-Wave Technology Installation MAN-01-00541-1.0
53