Install Manual
Table Of Contents
- Disclaimers
- Revision History
- Support and Contact Information
- Contents
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimisers
- Chapter 3: Installing the Inverter
- Chapter 4: Connecting the AC and the Strings to the Safety Switch
- Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter SetApp
- Chapter 6: Setting Up Communication
- Appendix A: Errors and Troubleshooting
- Appendix B: Mechanical Specifications
- Appendix C: Replacing and Adding System Components
- Technical Specifications - Single Phase Inverters with HD-Wave Technology (No...
Adding, Removing, or Replacing Power Optimizers
1. TurnOFFtheinverterON/OFF/Pswitch,andwaituntilthegreenLEDisblinking,indicatingthatthe
DCvoltageissafe(<50V),orwaitfiveminutesbeforecontinuingtothenextstep.
2. DisconnecttheACtotheinverterbyturningOFFthecircuitbreakersonthedistributionpanel.
3. TurnOFFtheSafetySwitch.
4. Disconnectandconnectthenecessarypoweroptimizers.
5. PerformpairingandotherproceduresdescribedinActivating,CommissioningandConfiguringthe
SystemUsingtheInverterSetApponpage33onallinverterstowhichpoweroptimizerswereadded
orfromwhichpoweroptimizerswereremoved.
6. Inthemonitoringplatform,usetheReplacebuttoninthelogical layouttab(insite
Admin).Replacetheserialnumberoftheremovedpoweroptimizerwiththeserial
numberofthenewlyinstalledpoweroptimizer.Referto
https://www.solaredge.com/sites/default/files/se-monitoring-portal-site-admin.pdf
-Single Phase Inverter with HD-Wave Technology Installation MAN-01-00541-1.0
62
Adding, Removing, or Replacing Power Optimizers