Install Manual
Table Of Contents
- Disclaimers
- Revision History
- HANDLING AND SAFETY INSTRUCTIONS
- IMPORTANT SAFETY INSTRUCTIONS / CONSIGNES DE SÉCURITÉ IMPORTANTES
- Photovoltaic Rapid Shutdown System Requirements
- Chapter 1: Introducing the SolarEdge Power Harvesting System
- Chapter 2: Installing the Power Optimizers
- Chapter 3: Installing the Synergy Manager and Synergy Units
- Synergy Manager Package Contents
- Synergy Unit Package Contents
- Identifying the Units
- Front Interface of Synergy Manager
- Inverter Interconnection Cable Interfaces
- Synergy Manager External Cable Interface
- Synergy Unit Interface Connectors
- Drilling Conduit Holes
- Mounting and Connecting the Synergy Manager and Synergy Units
- Chapter 4: Connecting AC and PV Strings to the Synergy Manager
- Chapter 5: Activating, Commissioning and Configuring the System
- Chapter 6: Setting Up Communication with the Monitoring Platform
- Appendix A: Errors and Troubleshooting
- Appendix B: Adding Optional Components
- Appendix C: Mechanical Specifications
- Technical Specifications - Three Phase Inverter with Synergy Technology
ON (1) - Turning this switch ON (after Power Optimizer pairing) starts the operation
of the Power Optimizers, enables power production and allows the inverter to
begin exporting power to the utility grid.
OFF (0) - Turning this switch OFF reduces the Power Optimizer Voltage to a low
safety voltage and inhibits exportation of power. When this switch is OFF, the
control circuitry remains powered up.
P Position duration Function Comments
Switch moved to P for
less than 5 seconds, then
released.
Displays production information
for 5 seconds on the SetApp
screen.
Displays error type indications (if
exist) for 5 seconds.
Activates the Wi-Fi access point
for connecting to the SolarEdge
Inverter SetApp
While the switch
is in P, all LEDs
are ON
Switch moved to P for
more than 5 seconds,
then released.
Starts pairing
WARNING!
For inverters with manual Rapid Shutdown (PVRSS) functionality - Upon
PVRSS, the internal circuitry remains up, therefore the inverter cover must
be opened only after shutting off the inverter ON/OFF switch. This disables
the DC Voltage inside the inverter (Synergy Manager). Wait five minutes
before opening the cover. Otherwise, there is a risk of electric shock from
energy stored in the capacitors.
AVERTISSEMENT!
A la Coupure Rapide (PVRSS) les circuits internes restent actifs, ilest donc
impératif de n'ouvrir le couvercle qu'après avoir arrêté l'onduleur à l'aide de
l'interrupteur ON/OFF. Ceci coupe la tension DC à l'intérieur de l'onduleur.
Attendez cinq minutes avant d'ouvrir le couvercle. Sinon, il y a risque
d'électrocution du à l'énergie stockée dans les condensateurs.
Chapter 3: Installing the Synergy Manager and Synergy Units 30
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx