Installation Guide

Step 2: Connecting a PV Module to a Power
Optimizer
l ConnectthePlus(+)outputconnectorofthemoduletothePlus(+)inputconnectorof
thepoweroptimizer.
l ConnecttheMinus(-)outputconnectorofthemoduletotheMinus(-)inputconnector
ofthepoweroptimizer.
Figure 7: Power optimizer connectors
NOTE
Images are for illustration purposes only. Refer to the label on the product to identify the
plus and minus input and output connectors.
Step 3: Connecting Power Optimizers in Strings
Youcanconstructparallelstringsofunequallength,thatis,thenumberofpoweroptimizers
ineachstringdoesnothavetobethesame.Theminimumandmaximumstringlengthsare
specifiedinthepoweroptimizerdatasheets.RefertotheSolarEdgeSiteDesignerforstring
lengthverification.
NOTE
The total cable length of the string (including power optimizers’ cables) should not exceed
1000ft./300m from DC+ to DC- of the inverter. Use at least 11 AWG/ 4 mm² DC cables.
Chapter 2: Installing the Power Optimizers
SolarEdge-Installation Guide MAN-01-00002-4.0
21