Installation Guide

To connect the AC grid to the Safety Switch – three phase
inverters:
1. Strip05⁄16''(8mm)oftheACwireinsulation.
2. InserttheACconduitintotheAC-sideknockoutthatwasopened.
NOTE
Connect the equipment grounding before connecting the AC wires to the AC.
Veillez à relier le conducteur de PE (la terre) avant de connecter les fils CA au bornier CA.
3. Connectthewiresasfollows:
l Useastandardflat-bladescrewdrivertoconnectthewirestothespring-clamp
terminals(SeeFigure28).
l Thescrewdriverbladeshouldfitfreelyintheterminalopening.Toolargeablade
cancracktheplastichousing.
l Insertthescrewdriver,pressthereleasemechanismandopentheclamp.
l Insertthewireintotheroundopeningandremovethescrewdriver–thewireis
automaticallyclamped.

Figure 28: DC Spring-clamp terminal – three phase inverter
SolarEdge-Installation Guide MAN-01-00002-4.0
40
Connecting the AC Grid to the Safety Switch