Installation Guide

l Vdc [V]:TheDCinputvoltageofthelongeststringconnectedtotheinverter.There
shouldbeasafetyvoltageof1Vforeachpoweroptimizerinthestring.
NOTE
A measurement error on the inverter LCD of ±3 V is acceptable.
l Pac [w]:theACoutputpower(shouldbe0.0sincetheinverterisOFF).
l OFF:theinverterON/OFFswitchisintheOFFposition.
Step 2: Pairing Power Optimizers to the Inverter
Onceallconnectionsaremade,allthepoweroptimizersmustbelogicallypairedtotheir
inverter.Thepoweroptimizersdonotstartproducingpoweruntiltheyarepairedwithan
inverter.Thisstepdescribeshowtoassigneachinvertertothepoweroptimizersfromwhich
itwillproducepower.
Performthisstepwhenthemodulesareexposedtosunlight.Ifthestringlengthischangedor
apoweroptimizerisreplaced,repeatthepairingprocess.
1. PressandholddowntheinverterLCDLightbuttonforabout10 seconds.Thefollowing
messageisdisplayed:
K e e p h o l d i n g b u t t o n
f o r p a i r i n g , r e l e a s e
t o e n t e r m e n u . . .
R e m a i n i n g : 3 s e c
Keepholdingfor5secondsuntilthefollowingisdisplayed:
P a i r i n g
T u r n S w i t c h T o O n
2. TurntheinverterON/OFFswitchtoONwithin5seconds.Ifyouwaitlongerthan5
secondstheinverterexitsthepairingmode.Thefollowingmessageisdisplayedindicating
thattheinverterisperformingthepairing:
P a i r i n g
R e m a i n i n g [ s e c ] : 1 8 0
Chapter 5: Commissioning the Installation
SolarEdge-Installation Guide MAN-01-00002-4.0
45