Solarland SLB-0119 install manual

® ®
The Solarland SLB-0119 mounting kit has been specifically design for use with the Solarland SLP Series
3W – 5W panels. This mount is a fixed.
Universal Flat Mount Bracket Kit
SLB-0119
Installation Manual
Step1.
Attach the PV module to the mounting bracket using
the clamp, bolts, washers and lock washers
provided. We suggest you lubricate all nuts and
bolts to facilitate easy removal at a later date.
Step2.
For pole mounting, use U bolts or steel
clamps to fix the PV module and mount
assembly to the pole.
See figure 1. The tilt
angle of the PV is situated at 40° to the
horizon. The U-Bolts and/or steel clamps are
not included in the kit.
Components And Parts
figure 2
figure 1
Note:
For vertical wall mounting, drill holes on the
mounting place to be installed according to size of
the fixed bracket. Embed two molly bolts into the
mounting surface.
See figure 2.
Use washers and, lock washers and nuts to secure
the PV module and mount assembly to the wall
surface.
Clamp
5052Al
1
Component
Material
Quantity
Part 1-2
Module Bolt(M6)
AISI304
2
Component
Material
Quantity
Part 1-3
5052Al
1
Component
Material
Quantity
Part 1-1
Part
Part 1-1
Part 1-2
Part 1-3
Part 1-2
Part 1-3
Part 1-1
Fixed Bracket

Summary of content (1 pages)