Bogging Ginseng Technologies Co., Lid. Ho. 57 Jingoist Road, Inhabit Industrial Park, Shaanxi, Bogging, Zhejiang, 318712, P.R. China. Tel: +86 6578 1808 Fae: +86 (0)574 6578 1608 Web www.ginlong.
1. Introduction 3 1.1 Product Description 3 1.2 Packaging 4 2. Safely Instructions 5 2.1 Safety Symbols 5 2.2 General Safely Instructions 5 2.3 Notice For Use 8 3. Overview 7 3.1 Front Panel Display 7 3.2 LED Status Indicator Lights 7 3.3 Keypad 8 34 LCD 8 4. Installation a 4.1 Select Location for the Inverter a 4.2 Mounting the Inverter 11 4.3 Electrical Connections 13 4.3.1 Connect PV side of inverter 13 4.3.2 Connect grid side of inverter 16 4.3.3 External ground connection 18 4.3.4 Max.
1. Introduction B83 Settings srsarsesasresenasesisanesssarsannsesan res nonsectarian 26 I — 6.3.1 Set Time wee 26 6.3.2 Set Address 26 1.1 Product Description 8.4 Advanced Info. 27 Solis 44 single pass inverters integrate DRM and back flow power control function, that 6.4.1 Alarm Message a7 could suitable for smart grid requirement. tr . Single phase 40 serials Inverter contain ¥ mod sis which ara listed below: &.4.2 Running Message 28 Solis-1P3K-4G, Solis-1 P4K-4E, 6.4.
1. introduction 2. Safety Instructions 1.2 eta cn improper uss may result In potential electric shock hazards or burns. This manual contains important instructions that should be followed during installation snd ‘When you receive the Inverter, ensure that all the parts listed below are Included: maintenance. Please read these instructions carefully before use and keep them for futures reference. 2.
WARMING: To reduces the risk of firs, over-current protective devices (CPD) ars required for circuits connected to the Inverter. The DC CPD sail be Installed per local requirements. All photovoltaic source and output culture conductors shall have disconnects that comply with the NEC Article 890, Fart 11. All Solis single phase inverters feature an integrated DC switch, CAUTION: Risk of electric shock.
3. Overview 4. Installation 3.3 Keypad 4.1 Select a Location for the Inverter There are four keys in the front panel of the Inverter(from left to right): Ta select a location for the inverter, the following criteria should be considered: ESC, UP, DOWN and ENTER keys.
4. installation 4. installation @ [natal on a wall or strong structure capable of bearing the weight. @ Install vertically with a maximum incline the mounted inverter is toted to an angle greater than the maximum noted, heat dissipation can be inhibited, and may result in less than expected output power, @ When 1 or more inverters are installed in one location, a minimum 1 conchs clearance should be kept between sate Inverter or other object.
4. installation 4. installation 2.Make sure the bracket is horizontal and the mounting holes (infighting 4.4) are marked correctly, Dill the bales int the wall or pillar af your marks, 3.Use the suitable screws fo fix the bracket to the wall. WARNING: The inverter must be mounted universally. 4 Lift up the inverter (be careful to avoid body strain), and align the back bracket on the inverter with the cones section of the mounting bracket.
4. installation 4. installation A Please use approved DC cable for PV system. Infuse gonorrhea PY cola | 40.0 (mass Pf) | a gnaw) 4.0 (12AWGE) & Tabla 4.1 DT cable The sleeps to assemble the DC connectors ars listed as follows: 1} Strip off the DC wire for about 7mm, Disassemble the connector cap nut. Eb =— EEC 4 Flours 4,8 Disassemble the Connector Cap aul 1} Insert the wits Intel the connector sap nut and contact pin, ==1} A Figure 4.9 Insert the Wire into the Connector Cap nut and contact pin 14.
4. installation 4. installation 2 Conn act grid side of inverter For all AC connections, 2.58mm’ 105 C cable is required fo be used. Please make sure the resistance of cable Is lower than 1 ohm. If the wire Is longer than 20m, It's recommended to use Brim’ cable. WARMING: There are “LY “NY = symbols marked inside the connector, the Line wire of grid must be connects to “L° terminal; the Neutral wires! grid must be connected to “N” terminal; the Earth of grid must be connected to “i” {ses Figure 4.13).
4. installation 4. installation 4} Connect the AC grid terminal connector to the Inverter. Small click will confirm connection. 4 Figure 4.18 Connect the AD Connector to the Inverter Mots: Colonnade for Spit pasha grid, When connect io 208/220/240V spl pass, pleads contrast L.1 to *L" terminal, L2 to “MN” terminal. Algol connect earth io ground terminal. An external ground connection Is provided at the right side of inverter. Prepares OT terminals: M4.
4. installation 4. installation ie TEE Foster to figure 4.271, which is 8 simple guidance for installing a solar system with PV inverter. ADE isolation 1s required io be installed In the system between PV panels with inverse. HAR CHEESEBOARD. Solar aged adn mth Comes AT Baler fog my cation wolfish 4 Figure 4.21 Guidance for a Simple installation of an Inverter Solar Energy System 1. The RCD should be in parallel connection between the consumers mains and the solar supply. 2. More than one RCD may be used.
4. installation 5. Start & Stop 1 EE ena ra] Lorie interface Is required by G98 and G99 standard halt can be operated by a simple switch or contractor. When the switch Is closed the Inverter can operated normally. When the switch ia opened, the inverter will reduce it's output power to zero within Ss. Pins and Ping of RJ45 terminal is used for the logic interface connection. Please follow below steps to assemble R48 connector, {Insert tha network cable Into the communication connection terminal of R48.
5 Operation 8 Operation During normal operation, the display alternately shows the power and the operation status with each screen lasting for 10 seconds (ses Figures 6.1). Screams can also be scrolled manually by pressing the UF and DOWN keys. Press the ENTER key to access io the Main Mani, Pressing the EBC key calls back the previous mine. Main Menu Crossing the ENTER key gives access to ths mle msn. & Figures 8.1 Operation Overview 6.1 Main Menu There ara four sub menus In the Man Menu (see Figure 8.
8 Operation 8 Operation Ilr Pressing tha E50 key returns io the Main Menu. Pressing the ENTER key locks (Figure or unlocks (Figure 8.2 (b)) the screen. Figures 8.2 Locks and Unlocks the Screen of LOD CRIBS The following sub menus are displayed when the Selling menu is selected: 1. Bet Time 2 Bat Address HEED This function allows teems and fete setting. Wuhan this function is selected, the LOD will display @ tureen as shown in Figure 8.3. & Figure 8.3 Set Time Crass the DOWNFIELD keys to set time and tads.
8 Operation 8 Operation EEE This function is for maintenance person fo get running message such as infernal temperature, Standard NO. ete. Serpens can be scrolled manually by pressing the UP/DOWN keys. FEET The surest shows the mods! version and the software version of the Inverter {see Figure 6.7). & Figure 8.7 Mode! Version and Software Version [1] energetically The function is for checking the energy generation for selected day. 4 Flours 6.
8 Operation 8 Operation IEEE This function Is used to select the grid’s reference standard {see Figure 6.18). 4 Figure 6.18 Press the UP/DOWN keys to select the standard VDE4108, VDED128, UL-240V-A, UL-208V-A, UL-240V, UL-208Y, MEX-CF, G32 (for models), B58/3 {for 4-510W models), ENSNARE DE, ENSHROUD IE, EN50438 NL and "User-Def function). Press the ENTER key to confirm the setting. Press the ESC key to cancel changes and returns to previous menu. MOTE: This function is for technicians use only.
8 Operation 8 Operation IE err Maintenance of replacement could clear or cause a different value of total energy. Use this function could allow user to revise the value of toll energy to the samey value as fora, If the monitoring wabbit is used the data will bs synchronous with this setting automatically. {sae Figures 8,20}. a Figure 6.20 Calibrate energy Press the DOWN key to move the cursor, Press the UP key to revise the value. Press the ENTER kay to executes the setting.
8 Operation 8 Operation FEET ET “The subhuman is used to sel meter in Load as shown as 4.3.7 Meter antivivisectionist. & Figure 8.23 Press Enter key to save the sealing. FREE ‘The sub menu is used io sel meter in Grid as shown 85 4.3.7 Merle conceptualization, & Figure 6.24 Press Enter key to save the setting. IER The sub menu is used io sel current sensor a8 shown as 4.3.8 CT ‘thees are £ modes shown 8s below: 1.07 Sampling Cello 2.07 Link test A Figure 6.
8 Operation 8 Operation Fillmore This sub menu is used for sel allowed power that inverter can generate bo grid, 4 Figure 8.20 Set the back flow power 4 Figure 8.31 Press the UP/DOWN keys fo set data. Press the ENTER kay to set back flow power Then press DOWN keys to move the cursor, press UP to change the number. Press the EST key to save the settings and return to the previous menu. IIE EEE EE This function iz used to remind whether the fail safe function is ON or not. The default setting is ON.
7. Maintenance 8. Trouble Shooting 7.Maintenance Solis Single Phases 4G Inverter does not require any regular maintenance, However cleaning the dust on heat-sink will help the inverter to dissipate the heat and increase its (ifs time. The dust can be removed with a soft brush. CAUTION: Do not touch the inverters surface when iris operating. Some parts of the inverter may be hot and cause burns. Turn off the inverter {refer to Section 5.